We’ve had a great two weeks hosting Dan from Veeco and putting our system together. Stay tuned for more
- Getting the system into the building has been a challenge
- The moment the system has landed in the lab
- Dan and Maria inspecting the growth chamber
- Main growth chamber turbo-pump and 10″ gate valve
- Dan is closely watching a 52 kg turbo-pump being hoisted into position
- Dan is making the final tests before plugging the system to a 100 Ampere power cord
- Getting ready for initial bake